Too many suppliers to coordinate
Separate HVAC, energy, charging and wiring suppliers create interface questions, sourcing complexity and overlapping service responsibilities.
Fleet PilotPilot 3–5 trucks for 60–90 days — scale on measured fuel savings. · Pilot 3–5 trucks.
Build engine-off comfort and auxiliary power into your vehicle program with a configurable 24V eAPU foundation—aligned to your electrical architecture, packaging constraints, validation requirements and long-term supply plan.

Complete eAPU architectures or selected modules, with interface, validation and production requirements agreed by project.
Adding idle-reduction HVAC and auxiliary power sounds straightforward until mounting, electrical interfaces, controls, documentation and warranty ownership must all work as one production vehicle.
Multiple standalone suppliers can leave your team responsible for compatibility, ownership gaps and changes throughout the vehicle lifecycle.
Separate HVAC, energy, charging and wiring suppliers create interface questions, sourcing complexity and overlapping service responsibilities.
Installation space, 12V/24V boundaries, mounts, airflow, harness routing and control logic must match your platform.
Environmental conditions, vibration, electrical limits and driver duty cycles can expose issues after the first build.
Inconsistent BOMs, revision changes, supplier lead times and replacement-part planning can affect the entire vehicle program.
A successful OEM eAPU program adds driver comfort and auxiliary power while keeping engineering effort, vehicle cost, assembly work and lifetime support predictable.
Discuss a matched system architecture under one interface review, rather than selecting every module in isolation.
Reduce coordination effortDefine harnesses, mounting, commissioning and service information around a specific vehicle platform and bill of materials.
Plan for manufacturingChoose only the HVAC, battery, charger, inverter and heating functions needed for the target vehicle and duty cycle.
Control program scopeWeVolt Apex offers an existing 24V eAPU system foundation. We can discuss a vehicle-specific package or selected core modules—and define the engineering work required before either becomes part of your production platform.
Battery, engine-off HVAC, bidirectional DC-DC charging, optional inverter and cab/engine heater with matched installation accessories for a project-specific vehicle configuration.
Specify one or more modules for an existing OEM architecture, with mechanical, electrical and interface compatibility assessed before project approval.
Illustrative integration flow — final voltage, interfaces, controls and electrical protection depend on the vehicle program.
Control integration, EMC, functional safety, charging behavior and OEM communication requirements are evaluated per project. This illustration does not imply plug-and-play CAN or ECU integration.
These are project discussion areas. Every variation requires engineering feasibility review and written specification approval.
Capacity targets, protection interfaces, enclosure placement, operational load profiles and battery access.
Target thermal capacity, airflow routing, mounting envelope, condenser location and environmental duty cycle.
12V→24V charging, reverse starter-battery support, interlocks, wiring protection and control strategy.
Inverter option, 120V loads, cab heating and optional engine coolant preheat where appropriate.
Project-specific cable lengths, terminations, connectors, fuse layouts and installation documentation.
Mounting brackets, service clearances, under-bunk packaging and build/commissioning instructions.
OEM configuration principle: Standard Apex module ratings provide a starting point—not automatic approval for every customized voltage, thermal output, mounting envelope or vehicle network. Final design, testing and part-number release are program-specific.
Proposed collaboration model · documents, test scope and approval authority are agreed for each OEM program.
A gated engineering process helps both teams identify technical and commercial risks before they become late vehicle-program changes.
Define target vehicle, volume, operating environment, desired functions, confidentiality and commercial expectations.
Project brief + confidentiality termsReview available mounting space, electrical budget, alternator capacity, cabin loads, heating demands and interfaces.
Feasibility findings + risk registerAgree wiring, mechanical drawings, power and charging limits, connectors, controls and initial BOM baseline.
Interface specification + design baselineBuild pilot units and run mutually defined tests for electrical function, environmental duty, installation and performance.
DVP / test results + issue closureConfirm assembly instructions, service access, production repeatability, line checks and any required approval submissions.
Build feedback + release checklistAgree supply volumes, quality evidence, revision changes, traceability, warranty responsibilities and replacement-part planning.
Supply, quality & support agreementsWhat "validated" means: design verification and production approval are defined by your OEM's acceptance criteria; they are not implied by a prototype run alone. PPAP, certification or OEM-specific approval documentation is scoped and assessed individually.
Your engineering team needs evidence and your purchasing team needs continuity. We propose defining quality, manufacturing change management and service expectations at project kickoff—not after SOP.
WeVolt can discuss a project-level documentation and support plan for OEM purchasing, engineering, production and field service teams. Deliverables and capabilities are confirmed during supplier qualification.
Formal quality certifications, OEM approvals and project-specific evidence are reviewed during supplier qualification and confirmed against agreed requirements.Define part numbers, drawings, approved alternates, configuration records and a controlled approach to design changes.
Agree critical characteristics, applicable incoming/end-of-line checks, lot or serial traceability and evidence retention requirements.
Review project-specific DVP, PPAP elements, required certificates and approval gates before serial deliveries.
Define spare-part coverage, field failure handling, diagnostic responsibilities, lead times and after-SOP support arrangements.
Industry reference: DTNA's supplier quality framework discusses process controls, traceability, engineering change approval and PPAP. The applicable documents, customer approvals and acceptance criteria are agreed for each OEM program. DTNA supplier portal ↗
Apex is an existing 24V eAPU system architecture that can be discussed as a complete integration starting point or as selected modules. Vehicle-specific adjustments require an engineering review, sample approval and written specifications.
Yes, these are areas described in WeVolt's current OEM solutions offering. Cable lengths, mounting arrangements, connector selection and routing are reviewed against your vehicle packaging and electrical constraints and confirmed in an agreed project scope.
At project kickoff we review your required qualifications, approval gates, PPAP elements and test evidence, then confirm available documentation, gaps and the agreed qualification plan. No generic kit approval substitutes for your vehicle-program release.
Component-level options can be discussed. Supply availability, interfaces, minimum quantities, responsibilities for controls, warranty and integration testing are confirmed during quotation.
A vehicle platform overview, electrical voltage and charging architecture, packaging drawings or available space, targeted climate loads, projected annual volume, program timing and expected validation/documentation standards. Confidential material can be reviewed following agreed NDA terms.
Those terms are program-specific and would be set out in commercial, quality and support agreements. WeVolt's standard retail warranty should not be treated as an automatically applicable OEM lifecycle or labor-reimbursement agreement.
Tell us what vehicle you are building and what your program needs. We'll start with an engineering feasibility conversation—not a fixed retail kit quotation.
Confidential technical information can be discussed after NDA review. Scope and response are subject to project assessment.
Quick enquiry
Whether it's one truck, an entire fleet, or a business partnership, share your needs and we'll get back with the right solution, pricing, and lead times.
Prefer email? [email protected]
Up to 10-Year Warranty
Long-term protection on every WeVolt system.
30-Day Returns
Hassle-free returns from the official store.
Lifetime Tech Support
Installation and troubleshooting help, for good.
Factory-Direct Shipping
Straight from our line to your truck.