Fleet Pilot · Pilot 3–5 trucks.

WEVOLT APEX · INSTALLATION & WIRING

WeVolt Apex Wiring Diagram
& Installation Guide

Trace every cable in the interactive diagram, then see which installation documents your confirmed Apex order or project receives — and when.

01 / INTERACTIVE WIRING GUIDE

Every cable. Every connection.

Choose a connection to watch power flow. Select a product, fuse, busbar or cable for its specifications and installation details.

APEX 24V SYSTEM

The inverter branch applies to Apex Power & Complete. Diesel heater wiring uses a separate 12V circuit.

SYSTEM WIRINGAPEX 24V
SUPPLY & STORAGEVehicle supply → conversion → house batteryDISTRIBUTION24V / 500A eachLOADSDC HVAC & 120V AC powerPositive busbar · WLT2409-J5 · 500A / 48VDCB+Negative busbar · WLT2409-J5 · 500A / 48VDCB−W1 · Vehicle → DC-DC · Positive (+)W1 · Vehicle → DC-DC · Negative (−)W2 · DC-DC → house battery · Positive (+)W2 · DC-DC → house battery · Negative (−)W0 · Battery → busbars · Positive (+)W0 · Battery → busbars · Negative (−)W5 · Busbars → outdoor unit · Positive (+)W5 · Busbars → outdoor unit · Negative (−)W4 · Busbars → indoor unit · Positive (+)W4 · Busbars → indoor unit · Negative (−)W3 · Busbars → inverter · Positive (+)W3 · Busbars → inverter · Negative (−)Alternator & starter battery · 12V vehicle electrical systemB1 / 12V VEHICLEAlternator &starter battery12V truck system+−Bidirectional DC-DC charger · WTDC-12-24V-50ADC1 / BIDIRECTIONALDC-DC charger12V ↔ 24V50A forward100A reverse29.2V · CC-CV14.4V · CC-CV96% efficiency @ 12VIP65WTDC-12-24V-50A+−+−ACC / RMTHouse battery · WTTB-24V-314AhB2 / LiFePO₄ STORAGEHouse battery8.04 kWh25.6V · 314Ah157A continuous150A max chargeIP65 · Bluetooth · Heating · Active balancingWTTB-24V-314Ah+−+−CHARGINGOutdoor unit · WTAC-24V-10C-5HC1 / WTAC-24V-10C-5HOutdoor unitVariable-speedCompressor + brushless fan24V DC21.5–32V inputRear of cab · R-134a+−Indoor unit · WTAC-24V-10C-5HH1 / WTAC-24V-10C-5HIndoor unitUnder the bunk10,0005,500BTU/h COOLINGBTU/h HEATING265 CFM · Electric heat · Dual outlets+−Pure sine wave inverter · IU24-3KWINV1 / IU24-3KWInverterPure sine wave3,000W6,000WCONTINUOUSSURGE120V AC · 60Hz · >93% max eff.+−FACTORY CONNECTIONF1 · Littelfuse MEGA · 150AF1 150AF2 · Littelfuse MEGA · 80AF2 80AF0 · RS308-HB · T fuse with holderF0 T fuseF3 · RS308-HB · T fuse with holderF3 T fuseS0 · 350A continuous / 48VDC maxS0 350AW1 · 2 AWG / 1m eachW12 AWG · 1mW2 · 4 AWG / 4m eachW24 AWG · 4mW0 · 1/0 AWG / 1m eachW01/0 AWG · 1mW5 · 8 AWG / 3m eachW58 AWG · 3mW4 · 16 mm² / 5m eachW416 mm² · 5mW3 · 2/0 AWG / 1m eachW32/0 AWG · 1mDEDICATED CHARGINGAll supply & storage connectionsremain left of the busbars.
Select a product, fuse, busbar or cable
YOUR POWER SYSTEM

From the road to your cab.

Choose a connection above for a clear view of its wiring. Tap any product for details.

↓ Battery power to the load busbars
↓ Separate positive and negative connections
Positive (+)Negative (−)Factory connectionConnection diagram · not to scale

One system. Five clear connections.

Supply and storage stay on the left. The busbars distribute power in the center. Air conditioning and AC power stay on the right. Choose a circuit above to follow its positive and negative connections.

Choose one of the five connections above to follow its positive supply and negative return. Tap products, fuses and cables to explore the installation details.

6 Equipment units6 Cable pairs5 Connection stages
Positive and negative connections are shown separately. Cable lengths are per cable.See the connection summary
02 / THE INSTALLATION PATH

Start at the source.
Finish at the load.

Five connections bring the 24V system together. Open any circuit below to see its positive supply and negative return.

CONNECTIONCABLE PAIR · LENGTH EACHPOSITIVE PROTECTION
01

Vehicle → DC-DC

12V starter system to charger A+ / A−

W1 · 2 AWG3.3 ft (1 m) each
F1 · 150A MEGANear the starter-battery positive connection
02

DC-DC → house battery

Charger B+ / B− directly to the battery

W2 · 4 AWG13.1 ft (4 m) each
F2 · 80A MEGAAt the house-battery end of the positive charging lead
03

House battery → busbars

The common supply for all 24V house loads

W0 · 1/0 AWG3.3 ft (1 m) each
F0 T fuse → S0 main switchBattery positive → fuse → switch → B+ busbar
04

Busbars → air conditioning

Separate power feeds for both A/C units

W5 · 8 AWG / 8 mm²Outdoor: 9.8 ft (3 m) eachW4 · 16 mm²Indoor: 16.4 ft (5 m) each
External HVAC fuses are optionalAdditional fuse assemblies are not included in this system
05

Busbars → inverter

24V DC input for optional 120V AC power

W3 · 2/0 AWG3.3 ft (1 m) each
F3 · T fuseAt the positive-busbar end of the inverter cable
Fuses and S0 are on the positive leads.Load negatives return through the black B− busbar.
YOUR SYSTEM COMPONENTS

System components

03 / Document access

When will you receive your full installation documents?

WeVolt releases detailed installation and wiring documentation at the appropriate project stage — with the specifications matched to your confirmed system and truck requirements.

01
Owner-Operators& DIYers
AFTER PURCHASE

After system selection, compatibility confirmation and purchase.

Once your Apex configuration and truck fitment are confirmed and the order is placed, we'll send the applicable installation documents for your system.

02
Truck Fleets
WHEN YOUR PILOT STARTS

After your Fleet Pilot is approved and formally initiated.

Your pilot vehicle receives the necessary installation package for its agreed test configuration — before any fleet-wide deployment.

03
Installers, Dealers& OEMs
AFTER PROJECT CONFIRMATION

After partnership or project scope is confirmed.

Relevant documents are supplied as required for the approved work. Sensitive engineering drawings and customization files may require a confidentiality agreement (NDA).

Need to confirm fitment before purchase? Our team can review essential compatibility and safety questions without releasing the full proprietary wiring and parts package.

04 / What you receive

The exact documents you need to install with confidence.

Your approved installation package goes beyond a basic user manual. It tells you how the selected Apex system connects, which installation parts are required, and how to check the completed installation.

DOCUMENT 01

Installation Diagrams & Wiring

System wiring diagrams showing the approved electrical connections, DC-DC controls, protective devices, grounding, and connections between Apex components.

Wiring diagramsConnection pointsPower & control wiringProtection layout
DOCUMENT 02

Detailed Parts List & Cable Schedule

A configuration-specific list of installation accessories and quantities, including the confirmed fuse models and ratings, cable gauges and lengths, terminal lugs, connectors, switches and related hardware.

Fuse models & ratingsCable lengths & gaugesParts & quantitiesTerminals & hardware
03

Mounting & Routing Guidance

Guidance on securing the relevant components, protecting cables, routing connections, and handling configuration-specific installation constraints.

04

Installation & Safety Checklist

Installation sequence, pre-power checks, polarity and connection verification, operating-mode checks and initial commissioning guidance.

05

Approved Customization Notes

Where applicable, the confirmed battery charging profile, custom accessories, special interfaces or other project-specific installation requirements.

What's supplied depends on your confirmed configuration. The interactive guide above shows the standard Apex system. Your controlled project documents confirm the final fuse and cable selection, quantities, installation revisions and any custom drawings for your approved configuration.
05 / Your next step

Ready for your installation package?

If you've purchased an Apex system or your pilot / professional project is approved, send us your order or project details. We'll confirm your documentation package and share the applicable files.

Request My Installation Documents For confirmed orders, formally initiated pilots and approved professional projects.
Not at that stage yet? Start here.
Owner-Operators & DIYers

Choose your Apex system and complete your truck fitment review.

Shop Apex Systems
Truck Fleets

Discuss pilot eligibility, scope and the first test vehicle.

Discuss a Fleet Pilot
Installers, Dealers & OEMs

Confirm your project scope and any confidentiality requirements.

Discuss Partner Access
06 / INSTALLATION QUESTIONS

A clearer route
to your installation.

Understand the connections before you start. Your installer can use the same guide on a phone, tablet or computer.

See how the Apex system works
Why does the charging cable connect directly to the battery?
W2 is the dedicated DC-DC charging pair. The separate W0 load feeder connects the house battery to the busbars, with F0 and S0 on its positive lead. Keeping these paths distinct makes the charging and load connections clear.
Does the main switch disconnect the entire system?
S0 isolates the load busbars. The separate DC-DC charging branch remains connected to the house battery. Stop the engine before switching S0 OFF.
Where are the fuses installed?
F1 protects the vehicle-side positive lead near the starter battery. F2 protects the positive charging lead at the house battery. F0 is on the battery’s positive load feeder before S0. F3 is at the positive-busbar end of the inverter branch. External HVAC fuse assemblies are optional accessories.
Can the A/C and inverter run at the same time?
Their combined continuous demand must stay within the house battery’s 157A continuous discharge rating. Air conditioning and inverter loads share the same battery and main feeder. Select the battery or inverter in the diagram to review the operating limits.
Does this diagram include the diesel heater?
This guide covers the 24V house-battery system, split air conditioner and optional inverter. The diesel heater uses a separate 12V supply and fuel connections. Refer to its installation instructions for that circuit.
How do I use the guide on my phone?
Choose connection 01–05 for a portrait wiring view. Tap a product or cable to open its details, then use Specifications, Connections or Installation tips. Select a cable polarity to trace the positive supply or negative return.
YOUR INSTALLER. WEVOLT BEHIND THE CONNECTION.

Your local shop.
Our installation support.

Share your truck model, mounting locations and planned loads. Get help reviewing your Apex layout, cable routing and installation questions.

Quick enquiry

Tell Us What You Need. We'll Find the Right Fit.

Whether it's one truck, an entire fleet, or a business partnership, share your needs and we'll get back with the right solution, pricing, and lead times.

  • Flexible Pricing & Fleet Pilots — Volume pricing from 3 systems, with fleet pilot options available.
  • Free System Configuration — We'll help tailor the 24V eAPU to your truck and requirements.
  • Personal Support Within 1 Business Day — Get a direct response from a WeVolt specialist.

Prefer email? [email protected]

Fleet, dealer, OEM or owner-operator — one form, routed to the right specialist.

Have detailed specs already? Open the full quote form

Up to 10-Year Warranty

Long-term protection on every WeVolt system.

30-Day Returns

Hassle-free returns from the official store.

Lifetime Tech Support

Installation and troubleshooting help, for good.

Factory-Direct Shipping

Straight from our line to your truck.